March 2012
Rainer Isenrich1 becomes new CEO/CFO of Edisun Power Europe Ltd.
December 2011
For the first time ever, annual power production tops 10 million kilowatt-hours.
October 2011
Construction begins on the largest facility to date, a 2.2-megawatt plant in Mallorca.
September 2011
In France, three plants with a total output of 2.1 megawatts go online.
January 2011
Edisun Power supplied 7.6 million kilowatthours of solar power in 2010, 35.7 percent more than in 2009.
December 2010
First series of 6-year bonds 20% oversubscribed.
August 2010
Solar power facilities with capacity of 1000 kilowatts connected to grid in France. Heinrich Bruhin becomes Chairman of the Board of Directors.
June 2010
1.039-megawatt solar power facility in Hörselgau connected to grid.
April 2010
Markus Kohler becomes CTO and Member of the Executive Board. Sale of the 610-kWp facility in Emsbüren to a fund in Germany.
February 2010
New Internet presence.
January 2010
Power production in 2009 up 36.4% year on year.
December 2009
In Emsbüren, Edisun Power installs a solar power facility with a capacity of 610 kilowatts in record time: a total of just ten weeks from planning to grid-connection.
September 2009
Edisun Power installs a solar power facility with a capacity of 145 kilowatts at the Zurich Exhibition Centre. At the time, this is already the 34th facility supplying power to the ewz solar power exchange.
Summer 2009
The first French systems, Super U, Open Club and Arthenas, are connected to the power grid.
July 2009
Edisun Power completes the first rooftop facility in Spain. Installed on nine industrial roofs in the municipality of Salinas, the system has a capacity of 700 kilowatts.
March 2009
Following a detailed evaluation, the Board of Directors of the Edisun Power Group appoints Mirjana Blume as CEO of Edisun Power Europe AG. As CFO she played a major role in the solar power company’s IPO in 2008.